GitScrum logo
Theme Preferences

54 IDE Themes
Your colors.

54 themes from the most popular IDE color schemes. Dracula, Nord, Tokyo Night, Catppuccin—all here. One click to switch. Instant preview.

54 themes. 23 families. Dark & light modes.

Dracula

Tokyo Night

Nord

Catppuccin

One Dark Pro

GitHub Light

54

themes

23

families

42

dark themes

12

light themes

Featured Themes

Legendary color schemes.
Built-in.

From the most beloved IDE themes to modern pastel palettes. Each theme carefully adapted to GitScrum's interface.

Dracula

DARK

Tokyo Night

DARK

Nord

DARK

Catppuccin

DARK

Mocha

One Dark Pro

DARK

SynthWave '84

DARK

Material

DARK

Palenight

Gruvbox

DARK

Dark

Rosé Pine

DARK

Everforest

DARK

Dark

GitHub

LIGHT

Light

Solarized

LIGHT

Light

Core Features

Instant switching.
Zero friction.

Live Preview

See the theme applied instantly. No page reload. No waiting.

One-Click Switch

Click a theme, it's applied. That simple.

Synced Preferences

Your theme choice follows you. Desktop, tablet, mobile—same look.

Dark & Light Modes

42 dark themes for night owls. 12 light themes for daylight workers.

IDE-Inspired

Every theme adapted from beloved code editors. Feels like home.

Auto-Save

Theme changes saved automatically. No save button needed.

For Agency Owners

Brand consistency.
Or personal preference.

Your team uses different themes, screenshots look inconsistent in client presentations.

Professional Screenshots

Choose a theme that matches your brand for consistent client-facing materials.

Team Freedom

Let developers work in their preferred colors. Productivity over uniformity.

Dark Mode Default

Modern, professional look that clients expect from tech-savvy agencies.

Our developers are happier, and our demo videos look consistent. Win-win.

A

Agency Founder

Letting each person choose their theme was a small change with big impact on morale.

M

Engineering Manager

For Managers

Reduced eye strain.
Happier team.

Team members complain about eye fatigue during long sessions reviewing boards and backlogs.

Eye-Friendly Options

Themes optimized for long hours. Solarized, Nord, Everforest—designed for reduced strain.

Personal Choice

Each team member picks what works for them. No one-size-fits-all.

Accessibility

High-contrast variants for team members who need them.

For Developers

Your favorite theme.
Already here.

Switching between your IDE and project management tool is jarring. Different colors break focus.

Match Your Editor

Use Dracula in VS Code? Use it here. Tokyo Night fan? We got you.

Zero Context Switch

Same colors across all tools. Your brain stays in flow.

54 Choices

From classics like Monokai to modern favorites like Catppuccin.

Finally, a PM tool that respects my color preferences. Dracula everywhere!

D

Full-Stack Developer

I was worried about dark mode, but they have light themes that look clean and professional.

C

Product Owner

For Clients

Light mode available.
If you prefer.

Dark themes look unfamiliar. You're used to traditional business software.

Light Mode Options

12 light themes available. GitHub Light, Solarized, Catppuccin Latte.

Professional Look

Clean, business-appropriate themes that don't feel like 'developer tools'.

Easy Reading

High contrast options for better readability during project reviews.

How It Works

3 seconds to switch.
Automatic save.

Open settings. Click a theme. Done. Your preference is saved instantly and syncs across all devices.

54 IDE-inspired themes
23 theme families
42 dark mode options
12 light mode options
Live preview
One-click switching
Cross-device sync
Automatic save
1

Open Preferences

Navigate to account settings and find Theme Preferences.

2

Browse Themes

Scroll through 54 themes. Each shows a live preview of colors.

3

Click to Apply

One click applies the theme instantly. Auto-saved. Done.

GitScrum vs. Alternatives

Theme options. Compared.

Most project management tools offer limited customization. GitScrum brings IDE-level theming.

FeatureGitScrumJiraAsanaMonday
Total themes54 themes2 (Light/Dark)2 (Light/Dark)2 (Light/Dark)
Dark mode42 options1 option1 option1 option
Light mode12 options1 option1 option1 option
IDE-inspired themesDracula, Nord, etc.NoNoNo
Instant previewYesNoNoNo
Theme variantsMultiple per familyNoNoNo
Cross-device syncYesNoYesYes
Auto-saveYesManualManualManual

Unlike competitors with basic light/dark toggles, GitScrum offers 54 IDE-inspired themes that feel like your code editor.

FAQ

Questions answered.

Can I use the same theme as my IDE?

Yes. We've adapted 54 popular IDE themes including Dracula, Nord, Tokyo Night, One Dark Pro, Monokai, and more. If you use it in VS Code, chances are we have it.

Do themes affect performance?

No. Themes only change CSS variables. Zero impact on loading times or app performance.

Can different team members use different themes?

Absolutely. Theme preference is personal. Each user chooses their own. No team-wide enforcement.

Will my theme sync across devices?

Yes. Your theme preference is saved to your account. Log in from any device and see your chosen theme.

Are there high-contrast accessibility options?

Yes. Themes like Gruvbox Hard, One Dark Pro Darker, and several light themes offer higher contrast for better readability.

Can I preview a theme before applying?

Yes. Each theme card shows a live preview of the color palette. Click to apply, see it instantly.

Is dark mode the default?

GitScrum default theme is dark, but you can switch to any of the 12 light themes anytime.

Can I request a new theme?

Yes! Contact support with the theme name and we'll consider adding it. We're always expanding the collection.

Your colors. Your way.

54 IDE themes. Dracula, Nord, Tokyo Night, Catppuccin, and more. Dark and light modes. One-click switching.

No credit card required · Setup in 2 minutes

Works with the agents you already use

Claude, Z.AI, ChatGPT, Gemini and the rest of your stack connect the same way. Tasks flow into one board, and the work ships out.

Claude
Z.AI
ChatGPT
Gemini
Cursor
Perplexity
VS Code
JetBrains