Design creates beautiful mockups in Figma.
Development gets a link and builds what they understand. Two weeks later, the implementation looks wrong.
The padding is off. The states are missing.
The interactions don't match. Design says 'I specified everything.' Development says 'The edge cases weren't covered.' Both are right.
The handoff was a document dump, not a conversation. Meanwhile, design is already three features ahead, designing things that may never get built because priorities shifted.
Development is blocked on screens that design hasn't started because they're busy with future features. The lack of synchronization creates waste on both sides.
The GitScrum Advantage
One unified platform to eliminate context switching and recover productive hours.









