PRO Annual — 50 users, $106.80/year

GitScrum logo
Solution

Kanban GitHub Integration 2026 | Auto-Sync Cards

PR merged but card still 'In Progress'? GitScrum: commits move cards, PRs auto-link, branches auto-connect. Board always accurate. 2 users free. Free trial.

Kanban GitHub Integration 2026 | Auto-Sync Cards
PRO Annual
$106.80/year · 50 users · no per-seat
Get PRO Annual

The developer workflow disconnect: The reality today: 1.

Pick up task from kanban board 2. Create branch in GitHub 3.

Go back to board, move card to 'In Progress' 4. Write code, make commits 5.

Open PR in GitHub 6. Go back to board, add PR link to card 7.

PR gets reviewed, merged 8. Remember to move card to 'Done' Step 3, 6, and 8 are overhead.

Developers forget them. Boards become outdated.

Managers ask 'what's the real status?' The board says 'In Progress,' the PR was merged yesterday. The integrated reality: 1.

Pick up task from kanban board 2. Create branch named TASK-123-add-login 3.

Write code, commit: TASK-123: Add login form 4. Open PR (auto-links to task) 5.

PR merges (card auto-moves to Done) Two steps eliminated. Zero overhead.

Board always accurate. GitScrum's GitHub integration: - Branch names with task IDs auto-link - Commits with task IDs appear in card activity - PRs automatically connect to cards - PR merge can auto-close tasks - No browser extension needed—native integration - Works with GitHub.com and GitHub Enterprise

The GitScrum Advantage

One unified platform to eliminate context switching and recover productive hours.

01

problem.identify()

The Problem

Manual board updates after every GitHub action

Cards and PRs constantly out of sync

Developers forget to update board status

Two sources of truth—board vs GitHub

Managers can't trust board accuracy

Time wasted context-switching to update cards

Commit history disconnected from task history

PR reviews happen without board visibility

02

solution.implement()

The Solution

Branch names auto-link to tasks (TASK-123-feature)

Commits with task IDs appear in card activity

PRs automatically connect to related cards

PR merge can auto-move cards to Done

Single source of truth—GitHub actions update board

Zero context switching for status updates

Full commit history visible on task cards

PR status visible directly in board view

03

How It Works

1

Connect GitHub Repository

Project settings → GitHub integration → Authorize GitScrum → Select repos. One-time setup takes 2 minutes. Works with multiple repos per project.

2

Branch Names Link Automatically

Create branch: `git checkout -b GS-47-add-user-auth`. The task ID (GS-47) in the branch name creates the link. Card now shows the branch. No manual action needed.

3

Commits Show on Cards

Commit: `git commit -m "GS-47: Add password validation"`. The commit appears in the card's activity timeline. Team sees development progress without checking GitHub.

4

PR Links and Auto-Closes

Open PR from your branch. GitScrum auto-links the PR to the task. When PR merges (or you add 'Closes GS-47' to PR description), card can auto-move to Done column.

04

Why GitScrum

GitScrum addresses Kanban Tool with GitHub Integration through Kanban boards with WIP limits, sprint planning, and workflow visualization

Problem resolution based on Kanban Method (David Anderson) for flow optimization and Scrum Guide (Schwaber and Sutherland) for iterative improvement

Capabilities

  • Kanban boards with WIP limits to prevent overload
  • Sprint planning with burndown charts for predictable delivery
  • Workload views for capacity management
  • Wiki for process documentation
  • Discussions for async collaboration
  • Reports for bottleneck identification

Industry Practices

Kanban MethodScrum FrameworkFlow OptimizationContinuous Improvement

Frequently Asked Questions

Still have questions? Contact us at customer.service@gitscrum.com

Does it work with GitHub Enterprise?

Yes. GitScrum supports both GitHub.com and GitHub Enterprise Server. Configure your enterprise URL in settings. Same integration features work regardless of where your GitHub is hosted.

What about GitLab or Bitbucket?

GitScrum focuses on GitHub integration as a core competency. GitLab and Bitbucket integrations are on the roadmap. For now, teams using those platforms can still use GitScrum with manual linking.

Can we customize which columns PR merge moves cards to?

Yes. Configure in project settings which column a card moves to when its linked PR is merged. Default is 'Done' but you can set it to 'QA' or 'Ready for Deploy' if that fits your workflow.

Does it work with monorepos?

Yes. Connect multiple repos to one project, or connect a monorepo and use path-based task linking. Tasks can be linked to specific commits within any connected repository.

Ready to solve this?

Start free, no credit card required. Cancel anytime.

Works with your favorite tools

Connect GitScrum with the tools your team already uses. Native integrations with Git providers and communication platforms.

GitHubGitHub
GitLabGitLab
BitbucketBitbucket
SlackSlack
Microsoft TeamsTeams
DiscordDiscord
ZapierZapier
PabblyPabbly

Connect with 3,000+ apps via Zapier & Pabbly